Moreno Valley Groundwater Development Program

3 Documents in Project

Summary

SCH Number
2014051001
Lead Agency
Eastern Municipal Water District (EMWD)
Document Title
Moreno Valley Groundwater Development Program
Document Type
NOD - Notice of Determination
Received
Posted
7/10/2014
Present Land Use
vacant / CC
Document Description
EMWD is in the final planning stages of its Moreno Valley Groundwater Development Program. The purpose of the program is to develop approximately 2,000 acre-feet per year of groundwater resources from the North Perris Groundwater Management Zone in the Moreno Valley area. The first phase would include drilling and testing a well. It would also be necessary to construct treatment facilities, equip a potable water well, and construct a pump station and related infrastructure. Secondly, a replacement well is planned to be drilled approximately 400 feet due east of Eastern's former Well 44. As part of the replacement project, Wells 43 and 44 would be abandoned in accordance with State and County regulations. Additionally, in the future it would also be necessary to construct pipelines to convey treated water to the existing potable water system. Treated water would either be conveyed to the 1764 Pressure Zone (PZ) and boosted to the 1860 PZ or conveyed to the 1860 PZ and boosted to the 1967 PZ. Various pipeline corridors for both options were considered. Limitations include the availability of large diameter transmission pipelines (>12") and a desire to avoid streets with heavy traffic.

Contact Information

Name
Helen Stratton
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Moreno Valley
Counties
Riverside
Cross Streets
Heacock Street and Hernlock Avenue
Parcel #
481-020-018
State Highways
Hwy 60
Township
3S
Range
3W
Section
6
Base
SBB&M

Notice of Determination

Approving Agency
Eastern Municipal Water District's
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print