State Route 58 Median K-rail and Ramp Friction Surface

Summary

SCH Number
2014048104
Lead Agency
Caltrans 6 (Fresno) (California Department of Transportation, District 6)
Document Title
State Route 58 Median K-rail and Ramp Friction Surface
Document Type
NOE - Notice of Exemption
Received
Posted
4/11/2014

Document Description
The project involves installation of two runs of temporary concrete barrier (K-rail) within the separation median, approximately 600-ft each with crash cushion endings, approximately 345-ft east of Real Road (PM R52.20) to the beginning of the SR-58/99 separation (PM R52.33) at the SR-58-99 interchange. And, install a layer of High Friction Surfacing, approximately 12,500-ft2, to the SR-58/99 SB connector ramp.

Contact Information
G. William "Trais" Norris
California Department of Transportation, District 6
844 M Street, Suite 200
Fresno, CA 93721

Phone : (559) 445-6447

Location

Cities
Bakersfield
Counties
Kern

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:21084;14CCR15300
Reasons for Exemption
The project has no effect on the surrounding environment, where the construction consists of placement of K-rail in the median without vegetation removal, and a high friction treatment to the road surface. There are no compensatory mitigation requirements associated with this project.
Download CSV New Search