Highway 1 Slope Stabilization

3 Documents in Project

Summary

SCH Number
2014042090
Lead Agency
Caltrans 6 (Fresno) (California Department of Transportation, District 6)
Document Title
Highway 1 Slope Stabilization
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
State highway right-of-way; adjoining parcel designated Resources & Rural Development zoned TP CC Timberland Production

Document Description
Caltrans proposes to construct two soil nail walls (retaining walls), one above the other. The northbound lane of Highway 1 would also be realigned slightly to the north. First, the highway would be widened on the north side from 1 to 16 feet for a distance of approximately 400 feet. When completed, the roadway would have two 12-foot-wide travel lanes, widened from approximately 10 feet. The northbound lane would have a 4-foot-wide paved shoulder; the southbound lane paved shoulder width would vary from 1 to 10 feet.

Contact Information
Michelle Ray
California Department of Transportation, District 6
855 M Street, Suite 200
Fresno, CA 93721

Phone : (559) 445-6425

Location

Counties
Sonoma
Cross Streets
2.6 miles south of Fort Ross Road on Highway 1
State Highways
Hwy 1
Waterways
Pacific Ocean, Mill Gulch
Other Location Info
about 6 miles north of Jenner

Notice of Completion

Review Period Start
Review Period End
Development Type
Transportation:Highway/Freeway (retaining walls above highway)
Project Issues
Aesthetic/Visual Coastal Zone Geologic/Seismic Water Quality Wetland/Riparian
Reviewing Agencies
Air Resources Board California Coastal Commission California Department of Parks and Recreation California Highway Patrol Department of Fish and Wildlife, Region 3 Department of Water Resources Native American Heritage Commission Regional Water Quality Control Board, Region 1 Resources Agency State Lands Commission
Download CSV New Search