Badger Street Bridge Replacement Project

2 Documents in Project

Summary

SCH Number
2014042079
Lead Agency
City of Sutter Creek
Document Title
Badger Street Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/25/2016
Present Land Use
Right-of-Way
Document Description
CDFW has executed Streambed Alteration Agreement No. 1600-2014-0247-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, the City of Sutter Creek. The project is limited the replacement of the Badger Street Bridge in the same location with a raised bridge profile structure, and improved roadway approaches to provide a bridge in compliance with local, regional and statewide plans. Minor channelization in the streambed is required to improve hydraulic capacity. The work includes removal of the existing bridge structure and construction of the concrete retaining walls and bridge abutments, regarding of the stream banks adjacent to eh bridge, removing remnant rubble, and lowering exposed high spots in the stream bedrock. Roadway and storm drain improvements are also included in the project description.

Contact Information

Name
Amy Kennedy
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Sutter Creek
Counties
Amador
Cross Streets
Badger Street and Spanish Street
Zip
95685
Total Acres
1.63
State Highways
Hwy 88, 49
Schools
Amador HS
Waterways
Sutter Creek
Township
6N
Range
11E
Section
7

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.