Clearlake Oaks County Water District Water Infrastructure Rehabilitation Project

4 Documents in Project

Summary

SCH Number
2014042074
Lead Agency
Clearlake Oaks County Water District
Document Title
Clearlake Oaks County Water District Water Infrastructure Rehabilitation Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Various
Document Description
Note: Revised The proposed project consists of various improvements to the existing water treatment, storage, and conveyance facilities, including: 1) install equipment for the ozone treatment process, equalization tank, aeration system, backflow prevention, and acid feed system; 2) replace and/or upgrade high service pumps 2 and 3; 3) install piping for backwash flows and tank drainage; 4) maintain equipment with corrosion protection improvements; 5) replace the existing granular activated carbon filter; 6) install a heating, ventilation, and air conditioning system; 7) upgrade 6 existing tank sites with new tanks, new booster pumps, site stabilization, replacement of pumps, new paint, piping, valves and/or other appurtenances; and 8) replace and upgrade hydrant, gate valve, and blow-off valves.

Contact Information

Name
Alan Gardner
Agency Name
Clearlake Oaks County Water District
Contact Types
Lead/Public Agency

Location

Cities
Clearlake
Counties
Lake
Cross Streets
Various
Zip
95423
Parcel #
Various
State Highways
Hwy 20
Airports
No
Schools
East Lake School
Waterways
Schindler Creek, Clear Lake
Township
14N
Range
7W
Section
30/31
Base
MDB&M

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 1 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), Central Valley Flood Protection Board, Delta Protection Commission, Delta Stewardship Council, Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
State Reviewing Agency Comments
California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
Development Types
Water Facilities (Type rehabilitation)
Local Actions
water facilities
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, GHG

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print