Suter Bypass Collecting Canal Culvert Rehabilitation - Hughes Road, Streambed Alteration Agreement Number 1600-2014-0047-R2

5 Documents in Project

Summary

SCH Number
2014042053
Lead Agency
California Department of Water Resources (DWR)
Document Title
Suter Bypass Collecting Canal Culvert Rehabilitation - Hughes Road, Streambed Alteration Agreement Number 1600-2014-0047-R2
Document Type
NOD - Notice of Determination
Received
Posted
6/27/2014
Present Land Use
Open Space and Agriculture
Document Description
The project is limited to replacing a deteriorated and undersized 36-inch diameter corrugated metal culvert with a precast box culvert with dimensions: length 60 feet, width 7 feet, and height 5 feet. Precast concrete headwalls (width 11 feet by height 8 feet) with flared wing walls (angled 30 degrees from headwall surface) will be installed on the inlet and outlet. Once the culvert and headwall assembly are in place, a reinforced concrete apron will be poured to key the structure into the channel bottom, and approximately 5 tons of 18-inch minus revetment will be placed around each headwall to reduce erosion. Sutter Maintenance Yard (SMY) staff will perform all site work except traffic control and asphalt paving, which will be performed by the Sutter County Public Works Department.

Contact Information

Name
Tanya Sheya
Agency Name
CDFW North Central Region
Contact Types
Lead/Public Agency

Location

Cities
Yuba City
Counties
Sutter
Cross Streets
Hughes Road and Schlag Road
Total Acres
.5
Airports
Vanderford Ranch
Waterways
Collecting Canal and Sutter Bypass
Township
14N
Range
2E
Section
10

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print