Lake-wide Aquatic Invasive Plant Control Project

8 Documents in Project

Summary

SCH Number
2014042043
Lead Agency
Tahoe Resource Conservation District
Document Title
Lake-wide Aquatic Invasive Plant Control Project
Document Type
NOD - Notice of Determination
Received
Posted
12/18/2014
Present Land Use
Recreation and Commercial
Document Description
The Tahoe Resource Conservation District, on behalf of the Tahoe Aquatic Invasive Specie Coordination Committee (AISCC), will conduct aquatic plant control and management throughout suitable habitat areas in Lake Tahoe, California and Nevada and the Truckee River between the dam at Lake Tahoe to River Ranch at Alpine Meadows Road. The Project Area will include suitable habitat areas infested with submerged aquatic plants within the Lake Tahoe shorezone, typically up to 11 meters in depth, and within the Truckee River. The Proposed Project is intended to continue aquatic invasive plant control efforts in locations where previous efforts have been successful, expand control efforts to include all known infestation areas, and to allow for rapid response to detections of new aquatic plant infestations. The State Lands Commission action is an approval of a 20-year General Lease - Public Agency Use through December 16, 2034.

Contact Information

Name
Jennifer Lucchesi
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency

Location

Cities
South Lake Tahoe
Counties
El Dorado, Placer
Zip
Numerous
Total Acres
11300
State Highways
US 50, SR 89, 28
Railways
No
Airports
No
Schools
No
Waterways
Lake Tahoe and Truckee River
Township
15N
Range
17E
Base
MDB&M

Notice of Determination

Approving Agency
California State Lands Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print