Lake-wide Aquatic Invasive Plant Control Project

6 Documents in Project

Summary

SCH Number
2014042043
Lead Agency
Tahoe Resource Conservation District
Document Title
Lake-wide Aquatic Invasive Plant Control Project
Document Type
NOD - Notice of Determination
Received

Document Description
The Tahoe Resource Conservation District, on behalf of the Tahoe Aquatic Invasive Specie Coordination Committee (AISCC), will conduct aquatic plant control and management throughout suitable habitat areas in Lake Tahoe, California and Nevada and the Truckee River between the dam at Lake Tahoe to River Ranch at Alpine Meadows Road. The Project Area will include suitable habitat areas infested with submerged aquatic plants within the Lake Tahoe shorezone, typically up to 11 meters in depth, and within the Truckee River. The Proposed Project is intended to continue aquatic invasive plant control efforts in locations where previous efforts have been successful, expand control efforts to include all known infestation areas, and to allow for rapid response to detections of new aquatic plant infestations. The State Lands Commission action is an approval of a 20-year General Lease - Public Agency Use through December 16, 2034.

Contact Information
Jennifer Lucchesi
California State Lands Commission
100 Howe Avenue, Suite 100-South
Sacramento, CA 95825-8202

916-574-1800
916-574-1810

Location

Coordinates
39°1'9.54"N 120°3'22.9"W
Cities
South Lake Tahoe
Counties
Placer El Dorado
Zip
Numerous
Total Acres
11300
State Highways
US 50, SR 89, 28
Railways
No
Airports
No
Schools
No
Waterways
Lake Tahoe and Truckee River
Township
15N
Range
17E
Base
MDB&M

Notice of Determination

Approving Agency
California State Lands Commission
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
California State Lands Commission 100 Howe Avenue, Suite 100-South Sacramento, CA 95825-8202

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search