New York House Road Over Dry Creek Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2014-0212-R2)
3 Documents in Project
Summary
SCH Number
2014042035
Lead Agency
Yuba County
Document Title
New York House Road Over Dry Creek Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2014-0212-R2)
Document Type
NOD - Notice of Determination
Received
Posted
1/12/2015
Present Land Use
Existing Bridge; A/RR; Natural Resources
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2014-0212-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Yuba County Public Works Dept.
The project is limited to the replacement of the existing bridge on New York House Road over Dry Creek. The new bridge will be a three-span, cast-in-place concrete slab, approx. 10 to 12-feet below grade and extend approx. 16-feet back along the edges of the wing walls. The abutments and bents will be supported on spread footing placed a minimum 2-feet into intact rock. A temporary water crossing will be needed to conduct work. The crossing will be constructed of culverts and clean fill material. A cofferdam will be used to divert stream flows during construction. The new bridge will require construction and realignment of the approach roadways, approx. 225 feet on both sides of the bridge. Work on the approach roadways will include the removal of the existing pavement, replacement of any failed roadway based areas, and the placement of new hot mix asphalt pavement. utilities, including an overhead telephone line and water lines will require relocation as well.
Contact Information
Name
Tanya Sheya
Agency Name
Yuba County Public Works Department
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Yuba
Cross Streets
0.2 miles west of Frenchtown Road & New York House Road Intersection
Zip
95919
Waterways
Dry Creek
Township
18N
Range
6E
Section
2/11
Base
MDB&M
Other Location Info
Camptonville
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.