Bethany Dams Improvement Project
11 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2014042030
- Lead Agency
- California Department of Water Resources (DWR)
- Document Title
- Bethany Dams Improvement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/17/2018
- Present Land Use
- State property (water conveyance system): grazed land. Adjacent to agricultural zone.
- Document Description
- To ensure the long-term safety and operations of the State Water Project, DWR proposes to conduct additional vegetation removal in the drainage ditches at Dams 1 and 2, remove accumulated sediment blocking the culvert in the drainage ditch at Dam 3, repair existing rodent burrow damage on the dam faces, establish a long-term, sustainable program of effective rodent control to reduce or eliminate further burrowing within the dam embankments, and perform annual maintenance to repair new rodent burrow damage at the four Bethany Reservoir Dams.
- Contact Information
-
Gerald Snow
California Department of Water Resources
Lead/Public Agency
1416 Ninth St, sixth floor
Sacramento, CA 95814
Phone : (916) 653-7213
Location
- Coordinates
- 37°46'58.4"N 121°36'51.8"W
- Cities
- Tracy
- Counties
- Alameda
- Cross Streets
- Christensen Road
- Zip
- 94514
- Total Acres
- 19.9
- Parcel #
- 998-7020-5
- Airports
- Byron
- Schools
- Mountain House Elementary
- Waterways
- Bethany Reservoir
- Township
- 2S
- Range
- 3E
- Section
- 02
Notice of Determination
- Approving Agency
- DWR
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- N/A
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.