Bethany Dams Improvement Project [California Endangered Species Act (CESA) Incidental Take of Permit No. 2081-2015-034-03 (ITP)]

11 Documents in Project

Summary

SCH Number
2014042030
Lead Agency
California Department of Water Resources (DWR)
Document Title
Bethany Dams Improvement Project [California Endangered Species Act (CESA) Incidental Take of Permit No. 2081-2015-034-03 (ITP)]
Document Type
NOD - Notice of Determination
Received
Posted
1/21/2016
Present Land Use
State property (water conveyance system): grazed land. Adjacent to agricultural zone.
Document Description
This project includes 1) seepage monitoring weir replacement, 2) palm tree removal at the interim plant outlet structure, and 3) drainage ditch improvements for vegetation control and seepage monitoring. The project area covered under this permit includes the three roads required for the work at Dams 1, 2, and 3. Approximately 0.99 acres of upland grassland will be converted to access roads. The project will result in impacts to 0.99 acres of California tiger salamander habitat; the project will permanently remove 0.99 acres of California tiger salamander habitat. The project is expected to result in incidental take of California tiger salamander, which is designated as a threatened species under CESA. The ITP referenced above as issued by CDFW authorizes incidental take pf species listed under CESA that may occur as a result of project implementation.

Contact Information

Name
Scott Wilson
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency

Location

Cities
Tracy
Counties
Alameda
Cross Streets
Christensen Road
Zip
94514
Total Acres
2
Parcel #
998-7020-5
Airports
Byron
Schools
Mountain House Elementary
Waterways
California Aqueduct
Township
2S
Range
3E
Section
02

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print