Non-Potable Water Golf Course Connection Projects

2 Documents in Project

Summary

SCH Number
2014041114
Lead Agency
Coachella Valley Water District (CVWD)
Document Title
Non-Potable Water Golf Course Connection Projects
Document Type
NOD - Notice of Determination
Received
Posted
6/29/2015
Present Land Use
Golf, Recreation, Open Space, and Residential
Document Description
The Non-Potable Water Golf Course Connection Projects consists of construction and operation of a total of six non-potable water connections that would be used to provide non-potable water for irrigation purposes to four existing golf courses. The non-potable connections consist of five pipeline segments that would connect three existing golf courses (Desert Horizons Country Club, The Lakes Country Club, and Palm Desert Country Club) to non-potable water service, and one pipeline segment that would increase the reliability of existing non-potable water service at another golf course (Desert Willow Golf Resort). Each new golf course connection includes an offsite connection (connection to an existing pipeline and installation of a meter) and an onsite connection (pipeline from meter to existing onsite golf course lake or pond).

Contact Information

Name
Luke Stowe
Agency Name
Coachella Valley Water District
Contact Types
Lead/Public Agency

Location

Cities
Palm Desert
Counties
Riverside
Cross Streets
Located at Desert Horizons Country Club, Palm Desert Country Club, and Desert Willow Golf Resort
Zip
Varies
Total Acres
4
Parcel #
Various
State Highways
Hwy 111, I-10
Airports
Bermuda Dunes
Schools
Numerous
Waterways
Whitewater River, Deep Canyon Wash
Township
5S
Range
6E
Section
4,10
Base
SBB&M
Other Location Info
Indian Wells
Other Information
Section Cont.: 13, 22

Notice of Determination

Approving Agency
Coachella Valley Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print