Stoller Winery Minor Use Permit; DRC 2013-00014
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2014041109
- Lead Agency
- San Luis Obispo County
- Document Title
- Stoller Winery Minor Use Permit; DRC 2013-00014
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/3/2014
- Present Land Use
- Agriculture
- Document Description
- Request by Craig Stoller for a Minor Use Permit to allow for a 13,525 square foot (S.F.) production winery that would be constructed in two phases. Phase I construction would include one building totaling 6,350 SF that includes: tank room (3,335 S.F.), a fermentation room (1,400 S.F.), and office/lab (625 S.F.), and a caretakers unit (970 S.F.). Areas outside of the winery building that is connected by a breeze way would include a covered crush pad (8,085 S.F.) and a deck (480 SF), and a 2 storage rooms (2,475 S.F.). Maximum wine production with build out would be 15,000 cases. The project does not include public tasting and special events. The project will result in the approximate disturbance of 2.5 acres of the 114 acre parcel.
- Contact Information
-
Jamie Kirk
San Luis Obispo County
976 Osos Street, Rm 200
San Luis Obispo, CA 93408-2040
Phone : (805) 461-5765
Location
- Coordinates
- 35°32'34"N 120°36'46"W
- Counties
- San Luis Obispo
- Cross Streets
- Northwest quadrant of the intersection of South El Pomar and Almond Dr
- Zip
- 93402
- Total Acres
- 114.59
- Parcel #
- 033-291-034
- Schools
- Templeton USD
- Other Location Info
- Templeton
Notice of Determination
- Approving Agency
- San Luis Obispo County
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- County of San Luis Obispo Dept of Planning & Building, 976 Osos Street, Room 200 San Luis Obispo, CA 93408-2040
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.