Response Plan for Oak Creek Development Project
5 Documents in Project
Summary
SCH Number
2014041092
Lead Agency
City of Escondido
Document Title
Response Plan for Oak Creek Development Project
Document Type
NOD - Notice of Determination
Received
Posted
11/4/2015
Present Land Use
Inactive agriculture / RR-1 and A79 / Estate Ii
Document Description
The project is implementation of a RP for excavation and offsite disposal of the impacted soil at the Oak Creek Development Project. The recommended remedy for the site also include a Land Use Covenant to prohibit the use of ground water under the entire Site.
- excavate approximately 346 bank "in situ" cy of impacted soil from identified locations
- if necessary, segregate and stockpile impacted soils that contain the chemicals of concerns at concentrations greater than the site-specific cleanup goals presented in Section 4.4 of the Final RP.
- conduct confirmation soil sampling, compare confirmation data to the cleanup goals, and excavate additional volume until the cleanup goals are met;
- load and transport approximately 346 bank "in situ" cy of impacted soil to an appropriate disposal facility; and if necessary, grade, backfill and compact previously excavated areas using clean import fill material. Obtaining the import fill material will be accordance with the current local government agency and DTSC guidance on import fill material.
- depending on soil types, the soil volume may be increased 10% - 25% after digging. As a rule of thumb, 1 cy of soil in natural/undisturbed state (bank "in situ" cy) equals 1.25 cy after digging (loose "fluff" cy) and equals 0.9 cy after compaction.
Contact Information
Name
Poonam Acharya
Agency Name
DTSC
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Escondido
Counties
San Diego
Cross Streets
Felicita Road, Hamilton Lane, Miller Ave
Zip
92029
Total Acres
41.4
Parcel #
Various
State Highways
I-5
Notice of Determination
Approving Agency
DTSC
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.