Berths 121-131 Yang Ming Container Terminal Redevelopment Project

Summary

SCH Number
2014041050
Lead Agency
Los Angeles, Port of (Port of Los Angeles)
Document Title
Berths 121-131 Yang Ming Container Terminal Redevelopment Project
Document Type
NOP - Notice of Preperation
Received

Document Description
The proposed Project would be accomplished in two phases. Phase I includes performing deepening and improvements at Berths 126-129, disposal of dredge material, expanding the West Basin Container Transfer Facility (WBICTF) by adding two loading tracks, demolishing the existing wharf and constructing a new wharf, replacing three of the eight existing 50 foot gauge container cranes with up to ten new 100-or 120 foot gauge cranes, installing associated infrastructure, and replacing and reconstructing asphalt and concrete to accommodate those changes. Phase II would demolish the existing wharf at Berths 121-126, cut back 3.7 acres of the land and create 2.1 acres of new land, construct a new, 1,400 foot long wharf, reconfigure the container yard, demolish existing buildings and construct new ones, and further expand and modernize the WBICTF.

Contact Information
Theresa Stevens
Port of Los Angeles
425 South Palos Verdes Street
San Pedro, CA 90731

(310) 732-7693

Location

Counties
Los Angeles

Notice of Completion

Review Period Start
Review Period End
Project Issues
Aesthetic/Visual Air Quality Archaeologic-Historic Biological Resources Noise Toxic/Hazardous Traffic/Circulation Water Quality Other Issues Other Issues: GHGE
Reviewing Agencies
Air Resources Board Air Resources Board, Transportation Projects California Coastal Commission California Department of Boating and Waterways California Department of Parks and Recreation Caltrans, District 7 Department of Fish and Wildlife, Region 5 Department of Toxic Substances Control Department of Water Resources Regional Water Quality Control Board, Region 4 Resources Agency State Lands Commission Native American Heritage Commission
Download CSV New Search