Ironwood State Prison Heating, Ventilation, and Air Conditioning System Project

2 Documents in Project

Summary

SCH Number
2014041006
Lead Agency
Corrections and Rehabilitation, Department of (California Department of Corrections and Rehabilitation)
Document Title
Ironwood State Prison Heating, Ventilation, and Air Conditioning System Project
Document Type
NOD - Notice of Determination
Received

Document Description
CDCR is proposing upgrades of the existing heating, ventilation, and air conditioning system at Ironwood State Prison, which is aging and currently requires continuous maintenance. The existing evaporative cooling unit would be replaced with a site-wide chilled water system for air conditioning. New facilities would include a central chilled water plant and thermal energy storage tank, as well as a separate electrical substation and associated power line that would be constructed by Southern CA Edison. Up to three additional employees would be hired for operation and maintenance of the facilities.

Contact Information
Roxanne Henriquez
California Department of Corrections and Rehabilitation
9838 Old Placerville Road, Suite B
Sacramento, CA 95827

916-255-3010

Location

Coordinates
33°33'47"N 114°55'6"W
Cities
Blythe
Counties
Riverside
Cross Streets
Wiley's Well Road
Zip
92225
Total Acres
1.5
State Highways
No
Railways
No
Airports
No
Schools
No
Waterways
No

Notice of Determination

Approving Agency
California Department of Corrections and Rehabilitation
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
CDCR Facility Planning, Construction, and Management, 9838 Old Placerville Rd, Suite B, Sacramento, CA 95827.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search