Vesting Tentative Subdivision Map 2014-01 - Traditions (Fitzpatrick Homes)

3 Documents in Project

Summary

SCH Number
2014032083
Lead Agency
City of Turlock
Document Title
Vesting Tentative Subdivision Map 2014-01 - Traditions (Fitzpatrick Homes)
Document Type
NOD - Notice of Determination
Received
Posted
6/6/2014
Present Land Use
Z: Low Density Residential GPD: Low Density Residential
Document Description
The applicant is proposing to subdivide a 2.2 acre parcel, located in the North Turlock Master Plan area, into 15 single family residential lots. The project will be developed in accordance with the RL (Low Density Residential) zoning district standards allowing a minimum lot size of 5,000 sf and a residential density ranging between three (3) and seven (7) dwelling units per acre. The overall density of the project is seven (7) dwelling units per acre. The project is consistent with the property's Low Density Residential (LDR) General Plan Land Use Designation and the North Turlock Master Plan. The subdivision will be required to annex to a Community Facilities District to mitigate the ongoing costs of public services.

Contact Information

Name
Debra Whitemore
Agency Name
City of Turlock
Contact Types
Lead/Public Agency

Location

Cities
Turlock
Counties
Stanislaus
Cross Streets
N. Tegner Raod, Sandstone Street, Mountain View Road
Zip
95382
Total Acres
2.20
Parcel #
087-026-003
State Highways
Hwy 99
Railways
Union Pacific
Schools
Pitman HS, CSUS
Township
5S
Range
10E
Section
4
Base
MDB&M
Other Location Info
Nearest Community: Keyes

Notice of Determination

Approving Agency
City of Turlock
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print