Trout Creek Trail

4 Documents in Project

Summary

SCH Number
2014032072
Lead Agency
City of Truckee
Document Title
Trout Creek Trail
Document Type
NOD - Notice of Determination
Received
Posted
4/23/2014
Present Land Use
Single Family Residential 1 dwelling unit / 2 AC, manufacturing
Document Description
The Town of Truckee is proposing to construct a new Class 1 paved trail between Northwoods Boulevard in the Tahoe Donner Community and Bridge Street in Downtown Truckee, with a spur connecting to the existing Trails End Class 1 trail to Pioneer Center. The proposed trail will be approximately 8,800 feet long, including the spur trail. A soft surface trail is also considered and is proposed roughly parallel to the paved trail. The trail will cross Trout Creek in 2 locations. A trailhead parking area is proposed near Northwoods Boulevard, along with trail amenities such as benches and trash receptacles. The trail crosses the APNs 18-010-51, 52; 19-400-05; 19-400-28; 45-230-06.

Contact Information

Name
Jessica Thompson
Agency Name
City of Truckee
Contact Types
Lead/Public Agency

Location

Cities
Truckee
Counties
Nevada
Cross Streets
Northwoods Boulevard, Bridge Street, Indian Jack Road, Euer Valley Road
Zip
96161
Total Acres
4.2
Parcel #
18-010-51, 52; 19-400-05; 19-400-28
State Highways
Hwy 80, 89
Railways
UPRR
Schools
Truckee ES, MS, HS
Waterways
Trout Creek
Township
17N
Range
16E
Section
9/10

Notice of Determination

Approving Agency
Town of Truckee Town Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print