Blair Road at EID Canal - Bridge Replacement (No. 25C0077) Project, (CIP# 77119):
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2014032069
- Lead Agency
- El Dorado County
- Document Title
- Blair Road at EID Canal - Bridge Replacement (No. 25C0077) Project, (CIP# 77119):
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/24/2014
- Present Land Use
- Public roadway - Low Density Residential (LDR) (one dwelling unit per 5.0 acres)
- Document Description
- Project involves the existing approximately 36-foot-long, 15-foot-wide, one-lane reinforced concrete slab bridge with a double barrel culvert (two 42-inch or equivalent size circular culverts) that meets current design standards and improves the horizontal alignment of the roadway. The proposed culvert would tie in with the existing 28-foot-wide roadway providing two 11-foot traffic lanes and 3-foot shoulders on each side of the roadway. The proposed culvert would be located at the existing bridge location. Widening would occur on both sides.
- Contact Information
-
Janet Postlewait
El Dorado County CDA Transportation Division
2850 Fairlane Court
Placerville, CA 95667
Phone : (530) 621-5993
Location
- Coordinates
- 38°45'29"N 120°36'7.2"W
- Counties
- El Dorado
- Cross Streets
- Blair Road, Natural Way, Patrick Lane, Pony Express Trail
- State Highways
- U.S. 50
- Waterways
- EID Canal
- Township
- 11N
- Range
- 12E
- Section
- 35
- Other Location Info
- Pollock Pines
Notice of Determination
- Approving Agency
- El Dorado County Board of Supervisors
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 2850 Fairlane Court, Placerville, CA 95667.
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.