CSU, Chico: Physical Science Bridge Replacement Project and the Selvester's Cafe Bridge Restoration Project

6 Documents in Project

Summary

SCH Number
2014032059
Lead Agency
California State University, Chico
Document Title
CSU, Chico: Physical Science Bridge Replacement Project and the Selvester's Cafe Bridge Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
6/29/2015
Present Land Use
LU: Public Services and Facilities Z: Public/Quasi Public Facilities

Document Description
To replace the existing pedestrian bridge with a vehicular bridge; maintain the existing utilities and rerouting a six inch domestic water line located within the channel bank. Rock slope protection and vegetation will be replaced in-kind for any disturbed areas, and up to nine trees will be replaced away from the bridge and above the design water surface elevation.

Contact Information
James Herota
Central Valley Flood Protection Board
3310 El Camino Avenue, Rm 151
Sacramento, CA 95821

Phone : (916) 574-0651

Location

Coordinates
39°43'52.56"N 121°50'38.93"W
Cities
Chico
Counties
Butte
Cross Streets
Arcadian Ave. & Sol-Wil-Le-No Ave
Zip
95929
Total Acres
1
State Highways
Hwy 99
Airports
Ranchero
Schools
CSU, Chico
Waterways
Big Chico Creek

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
3310 El Camino Avenue, Rm 151, Sacramento, CA 95821

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search