Decker Island Electrical Crossing
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2014032039
- Lead Agency
- Reclamation District 341
- Document Title
- Decker Island Electrical Crossing
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/13/2014
- Present Land Use
- Sacramento County: Levee, Agricultural AG-80, Recreation. Solano County: Mining, Agricultural A-160, Agriculture
- Document Description
- The project will extend electrical supply from existing PG&E lines on Sherman Island to the existing Decker Island operation via a buried electrical cable. The approximately 1,100-foot cable will cross approximately 900 feet of Horseshoe Bend, a branch of the Sacramento River, which separates Decker Island from Sherman Island.
- Contact Information
-
Jesse Barton
Reclamation District 341
Gallery and Barton, 1112 I Street, Suite 240
Sacramento, CA 95814
Phone : (916) 444-2880
Location
- Coordinates
- 38°5'55.2"N 121°42'29.2"W
- Cities
- Rio Vista
- Counties
- Sacramento Solano
- Cross Streets
- SR 160 and Sherman Island Levee Road
- Zip
- 94571
- Total Acres
- .4
- State Highways
- Hwy 160
- Railways
- No
- Airports
- Rio Vista
- Schools
- No
- Waterways
- Horseshoe Bend, Sacramento River
- Township
- 3N
- Range
- 2E
- Base
- MDB&M
Notice of Determination
- Approving Agency
- Reclamation District #341
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Gallery and Barton, 11020 I Street, Suite 240, Sacramento, CA 95814.
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.