Palmilla Development Project: Outfall Repair & Replacement (Lake or Streambed Alteration Agreement No. 1600-2013-0386-R3)

2 Documents in Project

Summary

SCH Number
2014032017
Lead Agency
Brentwood, City of (City of Brentwood)
Document Title
Palmilla Development Project: Outfall Repair & Replacement (Lake or Streambed Alteration Agreement No. 1600-2013-0386-R3)
Document Type
NOD - Notice of Determination
Received

Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2013-0386-R3, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Community Development Department, City of Brentwood. The Project is limited to the removal of an existing 54 inch diameter storm water outfall on the south embankment of Marsh Creek and replacement with an 84 inch diameter outfall. The existing outfall will be removed using and excavator and the new outfall will be backfilled with native soil and protected with 55 cubic yards of rip-rap, 22 of the cubic yards will be in the channel bed, installed slightly recessed from the natural streambed to allow natural sediment to cover the armoring structure. Two temporary coffer dams will be installed 10 feet wide by 5 feet long and 22 feet wide by 5 feet long. All work will be conducted operating equipment from beyond the top of bank.

Contact Information
Robert Stanley
CDFW Bay Delta Region
7329 Silverado Trail
Napa, CA 94558

707-944-5573

Location

Coordinates
37°56'13"N 121°42'9"W
Cities
Brentwood
Counties
Contra Costa
Cross Streets
Central Boulevard, Walnut Blvd
Zip
94513
Total Acres
60.6
Parcel #
Various
State Highways
SR 4
Railways
UPRR
Schools
Ron Numn ES, Garin ES, Liberty HS
Waterways
Marsh Creek
Township
1N
Range
2E
Section
13
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
CDFW Bay Delta Region, 7329 Silverado Trail Napa, CA 94558

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search