Jewell Creek Fish Passage Restoration Project (Lake or Streambed Alteration Agreement No. 1600-2015-0019-R3)

3 Documents in Project

Summary

SCH Number
2014032013
Lead Agency
Marin Municipal Water District
Document Title
Jewell Creek Fish Passage Restoration Project (Lake or Streambed Alteration Agreement No. 1600-2015-0019-R3)
Document Type
NOD - Notice of Determination
Received
Posted
2/22/2016
Present Land Use
Public Park & Open Space / Open Area
Document Description
CDFW has executed lake and streambed alteration agreement no. 1600-2015-0019-R3, pursuant to section 1602 of the fish and game code to the project applicant, Marin Municipal Water District. The overall project involves stabilizing a portion of the Permittee's water line that runs with the Cross Marin Trail, above and perpendicular to the creek culvert. During the water line stabilization an existing failing 90-ft long corrugated metal pipe culvert in Jewell Creek will be removed and replaced with a new arched bottomless culvert. The new culvert will be 11-ft wide, 5-ft, 9-in tall, and approximately 90-ft long. Two new concrete footings will be installed in the streambed/bedrock to support the spanning bottom less culvert. Five new grade control rock weirs will be installed in the streambed to maintain a 4% grade through the reach to facilitate fish passage.

Contact Information

Name
Timothy S. Dodson
Agency Name
CDFW Bay Delta
Contact Types
Lead/Public Agency

Location

Counties
Marin
Cross Streets
Sir Francis Drake Boulevard & Taylor Park Road
Zip
94950
Parcel #
166-070-21
Waterways
Jewell Creek & Lagunitas Creek
Other Location Info
Olema

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print