Former Exide Visalia Facility, Corrective Action Implementation
2 Documents in Project
Summary
SCH Number
2014031080
Lead Agency
California Department of Toxic Substances Control
(DTSC)
Document Title
Former Exide Visalia Facility, Corrective Action Implementation
Document Type
NOD - Notice of Determination
Received
Posted
5/6/2014
Present Land Use
commercial/industrial use, zoned light industrial
Document Description
The proposed remedy is to consolidate and cap soil that exceeds the cleanup goal within the area of contamination. About 5,000 to 7,000 cubic yards (CY) of lead contaminated soil will be excavated from the southern and eastern portions of the Site and compacted on the southeast corner of the area of contamination. Excavation is expected to be to a depth of up to 3 feet below ground surface (bgs). A concrete cap will be constructed over the contaminated soil and will be utilized as an above ground concrete base for a commercial building to be built at some time in the future as a separate, stand-alone project. The excavated areas will be restored with clean fill material obtained by excavating a storm water control basin in the south central portion of the Site.
Contact Information
Name
Martin Herrmann
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Visalia
Counties
Tulare
Cross Streets
Avenue 304 & Rd 80
Zip
93291
Total Acres
10.4
Parcel #
081-11-077-49
State Highways
Hwy 99
Railways
UPRR
Airports
Visalia Municipal
Schools
Various
Waterways
Minor surface drainage channels within 1/2 -1 mile
Township
18S
Range
24E
Section
29
Notice of Determination
Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.