Former Exide Visalia Facility, Corrective Action Implementation

2 Documents in Project

Summary

SCH Number
2014031080
Lead Agency
Toxic Substances Control, Department of (Department of Toxic Substances Control)
Document Title
Former Exide Visalia Facility, Corrective Action Implementation
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed remedy is to consolidate and cap soil that exceeds the cleanup goal within the area of contamination. About 5,000 to 7,000 cubic yards (CY) of lead contaminated soil will be excavated from the southern and eastern portions of the Site and compacted on the southeast corner of the area of contamination. Excavation is expected to be to a depth of up to 3 feet below ground surface (bgs). A concrete cap will be constructed over the contaminated soil and will be utilized as an above ground concrete base for a commercial building to be built at some time in the future as a separate, stand-alone project. The excavated areas will be restored with clean fill material obtained by excavating a storm water control basin in the south central portion of the Site.

Contact Information
Martin Herrmann
Department of Toxic Substances Control
8800 Cal Center Drive
Sacramento, CA 95826-3000

916 255 3592

Location

Coordinates
36°20'27.75"N 119°23'26.83"W
Cities
Visalia
Counties
Tulare
Cross Streets
Avenue 304 & Rd 80
Zip
93291
Total Acres
10.4
Parcel #
081-11-077-49
State Highways
Hwy 99
Railways
UPRR
Airports
Visalia Municipal
Schools
Various
Waterways
Minor surface drainage channels within 1/2 -1 mile
Township
18S
Range
24E
Section
29

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Department of Toxic Substances Control Brownfield and Environmental Restoration Program 8800 Cal Center Dr., Sacramento CA 95826

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search