University Wash Channel Stage 3 Project
3 Documents in Project
Summary
SCH Number
2014031054
Lead Agency
Riverside County Flood Control and Water Conservation
Document Title
University Wash Channel Stage 3 Project
Document Type
NOD - Notice of Determination
Received
Posted
7/14/2014
Present Land Use
General Industrial and Industrial Business / Office Park; Zoned General Industrial and Industrial Business / Manufacturing Park
Document Description
The University Wash Channel, Stage 3 project consists of construction and maintenance of approximately 2,500 linear feet (LF) of 90-inch reinforced concrete pipe underground storm drain and associated catch basins, access manholes, street repaving, and grading of approximately two acres. The Riverside County Flood Control and Water Conservation District would manage construction, and own, operate and maintain the storm drain mainline. The City of Riverside would maintain the catch basins (i.e., drain inlets) and connector pipes. Once constructed, the proposed project would provide 10-year flood protection to the adjacent area and would substantially improve drainage along the project reach during the majority of storm events. Additionally, when ultimately paired with future master planned improvements upstream, the proposed storm drain improvements would provide 100-year flood protection to adjacent properties and public right-of-way.
Contact Information
Name
Kris Flanigan
Agency Name
Riverside County Flood Control
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Riverside
Counties
Riverside
Cross Streets
Kansas Ave and Spruce Street; Massachusetts Ave and Durahart Street
Zip
92507
Total Acres
8.1
State Highways
SR 91 and 60
Airports
No
Waterways
Santa Ana River
Township
2S
Range
5W
Section
24
Base
SBB&M
Notice of Determination
Approving Agency
Riverside County Flood Control and Water Conservation District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No