Former Kast Property Tank Farm Site Remedial Action Plan
4 Documents in Project
Summary
SCH Number
2014031053
Lead Agency
Regional Water Quality Control Board, Region 4 (Los Angeles)
Document Title
Former Kast Property Tank Farm Site Remedial Action Plan
Document Type
NOD - Notice of Determination
Received
Posted
7/15/2015
Present Land Use
The site currently is a residential neighborhood known as the Carousel Tract. The site is designated Low Density Residential in the City of Carson General Plan and is zoned Residential
Document Description
The project is the Los Angeles Water Board's approval of a Remedial Action Plan for the cleanup of the site. The RAP proposes to remediate the site to achieve site-specific clean up goals established by the Los Angeles Water Board. The RAP consists of the following multi-media components to remediate the site: excavation of soils at impacted properties to a depth of 5 feet and targeted at some properties to 10 feet below ground surface; soil vapor extraction (SVE)/bioventing; sub-slab vapor mitigation at a subset of properties; LNAPL recovery from groundwater; and groundwater source reduction and monitored natural attenuation. Implementation of remediation activities would potentially commence in Fall 2015. Excavation actions would take approximately 6 years and other remedies may take 30 to 40 years.
Contact Information
Name
Teklewold Ayalew
Agency Name
Regional Water Quality Control Board, Region 4 (Los Angeles)
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Carson
Counties
Los Angeles
Cross Streets
Lomita Blvd between Avalon Boulevard and Main Street
Zip
90745
Total Acres
44
Parcel #
Carousel Tract
State Highways
I-405, 110, Hwy 1 PCH
Railways
Metro Transp Agncy
Airports
No
Schools
Wilmington MS
Waterways
Flood control channel to west
Township
3S
Range
12W
Notice of Determination
Approving Agency
LA RWQCB
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.