Guadalupe Cooling Minor Use Permit; DRC2012-00104
Summary
- SCH Number
- 2014029003
- Lead Agency
- San Luis Obispo County
- Document Title
- Guadalupe Cooling Minor Use Permit; DRC2012-00104
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/3/2014
- Document Description
- Request by Guadalupe Cooling Company and AT&T for a Minor Use Permit to allow for the construction and operation of an unnamed wireless communications facility considering of 12 panel antennas and 12 Remote Radio Units (RRUs) mounted at a maximum height of 29 feet within the cylinder portion of a 34-foot tall artificial water tank. Also included is ground-mounted equipment on a 20' x 25' concrete pad and associated utility trenching. The proposed project would remove an existing facility, consisting of a 30-foot tall monopole with three panel antennas and ground-mounted equipment, located on the same parcel approximately 900 feet south of the proposed artificial water tank. The proposed project would result in the disturbance of approximately 500 square feet on a 20-acre parcel. The proposed project with the Agriculture land use category.
- Contact Information
-
Airlin Singewald
San Luis Obispo County
Lead/Public Agency
County Government Center, Room 310
San Luis Obispo, CA 93408-2040
Phone : (805) 781-5600
Location
- Counties
- Santa Barbara
Notice of Determination
- Approving Agency
- San Luis Obispo County
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- County of San Luis Obispo Department of Planning & Building, 976 Osos Street, Rm. 200, San Luis Obispo CA 93408-2040
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.