Quarantina Street Permeable Pavers Project

Summary

SCH Number
2014028094
Lead Agency
Santa Barbara, City of (City of Santa Barbara)
Document Title
Quarantina Street Permeable Pavers Project
Document Type
NOE - Notice of Exemption
Received

Document Description
The project proposes removal of the existing concrete sidewalks and asphaltic concrete (A/C) street surface on Quarantina Street to be replaced with new A/C paving, curbing, and permeable pavers in same location for a distance of approximately 1,100 linear feet. The project involves the following improvements: (1) Removal of approximately 60,000 square feet of existing concrete sidewalk and A/C street surface; (2) Removal of existing base material to a depth of approximately 12 inches; (3) Installation of new base material to same depth; (4) Construction of new curbing for tree well bulbs (pop-outs); (5) Installation of permeable pavers in place of previous concrete sidewalks; (6) Replacement of A/C paving for street surface.

Contact Information
Steve Greer
City of Santa Barbara, Planning Division
P.O. Box 1990
Santa Barbara, CA 93102-1990

(805) 564-5470

Location

Cities
Santa Barbara
Counties
Santa Barbara

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15301
Reasons for Exemption
The project proposes repair and minor alteration to existing sidewalks and street. Proposed improvements are located entirely within city rights of way and areas previously disturbed for existing sidewalk and street improvements. No excavation will be required beyond what has previously occurred for existing sidewalk and street improvements. No expansion of use is proposed.
Download CSV New Search