G2 Modification to Existing Geothermal Power Plant [Mammoth Pacific / Ormat]

Summary

SCH Number
2014028073
Public Agency
Great Basin Air Pollution Control District
Document Title
G2 Modification to Existing Geothermal Power Plant [Mammoth Pacific / Ormat]
Document Type
NOE - Notice of Exemption
Received
Posted
2/7/2014
Document Description
This project involves disconnecting the "G2" geothermal power plant from the "G3" geothermal power plant. They currently are both piped to a shared Corken unit, which removes entrained ambient air from the motive fluid. The Corken unit will be dedicated only to G2. This project does not involve changing out of any equipment, nor changing the binary / working fluid.

Contact Information

Name
Theodore D. Schade
Agency Name
Great Basin Air Pollution Control District
Contact Types
Lead/Public Agency

Location

Cities
Mammoth Lakes
Counties
Mono

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15301
Reasons for Exemption
The G2 geothermal power plant separation from G3 will cause no change in emissions, megawatts, brine usage, wells used, no new facilities or structures and no change in height or elevation or footprint of the plant, and will have no significant effect on the environment.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print