Raley's Dock Replacement and Rice Mill Pier Rehabilitation Project

8 Documents in Project

Summary

SCH Number
2014022054
Lead Agency
City of West Sacramento
Document Title
Raley's Dock Replacement and Rice Mill Pier Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
12/4/2018
Present Land Use
RD- Recreation-Parks; RMP- Riverfront Mixed Use /RD-Recreation-Parks; RMP-Waterfront-Planned Development No 41
Document Description
Construction of a replacement dock with a facility that is open to the public, meets current building and safety standards, and is accessible and compliant with California Building Code provisions. The proposed dock would be 432 feet long overall, with a 25-foot-wide, 60-foot-long dock on the downstream end and an 8-foot-wide, 371-foot-long upriver section. The new floating docks would support dead loads consisting of utilities, access gangways and landing platforms, and live (transient) loads. Vessels would be able to temporarily moor to the floating docks, and all float modules would be held in position by guide piles. The new dock would also provide a new recreatuibak boating facility with docking available for small boats, water taxis, and other vessels. State Lands Commission action is an amendment to a 20-year General Lease - Public Agency use through December 14, 2031.

Contact Information

Name
Mary Jo Columbus
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency

Location

Cities
West Sacramento
Counties
Yolo
Cross Streets
RD: 3rd Street and G Street; RMP: Mill Street and Riverfront Street
Zip
95691
Total Acres
.37
Parcel #
010-422-13, 058-350-06
State Highways
Hwy 80, 5
Railways
Old Sacramento
Schools
WUSD, 5 schools
Waterways
Sacramento River

Notice of Determination

Approving Agency
California State Lands Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print