Raley's Dock Replacement and Rice Mill Pier Rehabilitation

8 Documents in Project

Summary

SCH Number
2014022054
Lead Agency
City of West Sacramento
Document Title
Raley's Dock Replacement and Rice Mill Pier Rehabilitation
Document Type
NOD - Notice of Determination
Received
Posted
12/23/2014
Present Land Use
RD- Recreation-Parks; RMP- Riverfront Mixed Use /RD-Recreation-Parks; RMP-Waterfront-Planned Development No 41
Document Description
The City of West Sacramento intends to build a replacement dock with a facility that is open to the public, meets current building and safety standards, and is accessible and compliant with the California Building Code provisions of accessibility and requirements of the ADA. The Sacramento River is approximately 500 feet wide at the proposed dock location. The proposed dock would be 432 feet long overall, with a 25-foot-wide, 60-foot-long dock on the downstream end and an 8-foot-wide, 372-foot-long upriver section. The new floating docks would support dead loads consisting of utilities, access gangways and landing platforms, and live (transient) loads. Vessels would be able to temporarily moor to the floating docks, and all float modules would be held in position by guide piles. The new dock would provide a new recreational boating facility with docking available for small boats, water taxis and other vessels, and the dock would meet current building code and safety standards as well as adhere to the California Building Code provisions for accessibility and be ADA-compliant.

Contact Information

Name
John Sneed
Agency Name
City of West Sacramento
Contact Types
Lead/Public Agency

Location

Cities
West Sacramento
Counties
Yolo
Cross Streets
RD: 3rd Street and G Street; RMP: Mill Street and Riverfront Street
Zip
95691
Total Acres
.37
Parcel #
010-422-13, 058-350-06
State Highways
Hwy 80, 5
Railways
Old Sacramento
Schools
WUSD, 5 schools
Waterways
Sacramento River

Notice of Determination

Approving Agency
City of West Sacramento
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.