Miner Slough Levee Repair
5 Documents in Project
Summary
SCH Number
2014022046
Lead Agency
California Department of Water Resources
(DWR)
Document Title
Miner Slough Levee Repair
Document Type
NOD - Notice of Determination
Received
Posted
4/2/2014
Present Land Use
Area zoned agricultural, but designated "other lands"
Document Description
DWR proposes to repair the Miner Slough levee from approximate river miles 1.8 to 5. The levee repair will be completed from a barge within Miner Slough with assistance from equipment, most likely an excavator, on the levee crown. DWR proposes to repair the levee by placing a rock slope protection and soil mix to reshape the area to the original levee slope. The work will be done in a manner that will not change the character, scope, or size of the original levee design and will not result in expanding the existing use of the levee. Seeding and replanting with native seed and trees will follow up the repair work. The project is located within the Liberty Island Quadrangle, Township 5 North, Range 3 East, MDB&M.
Contact Information
Name
Michelle Phillips
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Solano
Cross Streets
Near SR 84 and Holland Rd
Total Acres
1.12
State Highways
Hwy 84
Waterways
Miner Slough
Township
5N
Range
3E
Other Location Info
Walnut Grove
Notice of Determination
Approving Agency
Dept. of Water Resources
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.