Yountville Hill Winery

4 Documents in Project

Summary

SCH Number
2014022035
Lead Agency
Napa County
Document Title
Yountville Hill Winery
Document Type
NOD - Notice of Determination
Received
Posted
7/17/2014
Present Land Use
Use: Residential/Agricultural - Zoning: Agricultural Preserve (AP) - GP: Agricultural Resource (AR)
Document Description
This permit shall be limited to establishing a new winery with an annual production capacity of 100,00 gallon. Approval of a use permit and an exception to the conservation regulations, variance, and view shed application to establish a new winery and with an annual production capacity of 100,000. The proposal also includes an exception to the conservation regulations to grade/construct improvements on slopes exceeding 30%, a view shed application to construct on slopes 15% or greater and visible from a view shed designated roadway (SR 29) and a variance to allow the lower cave portal and winery related activities on the pad in front of the cave to encroach approximately 300-feet into the 600-foot setback from SR 29, a staircase at the rear of the winery building to encroach 6-feet into a 20-foot rear yard and a non-habitable portion of the structure/landscaped terrace and stairs at the third or roof level to encroach 15-feet into the 20-foot rear yard. The project site is comprised of two parcels that will be combined. An existing 4,000 sq. ft. residence and garage, the existing driveway from SR 29 to the structures, and a cave will be removed as part of the proposal to facilitate construction of the winery, a new driveway, and associated improvements.

Contact Information

Name
Sean Trippi
Agency Name
Napa County
Contact Types
Lead/Public Agency

Location

Cities
Yountville
Counties
Napa
Cross Streets
7400 St. Helena Highway
Zip
94558
Total Acres
10.89
Parcel #
031-130-028 & 029
State Highways
Hwy 29
Railways
NV Wine Train
Waterways
Napa River, Hopper Creek, Conn Creek, Rector Creek

Notice of Determination

Approving Agency
Napa County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print