I-80 Colfax Truck Climbing Lanes Project (Lake or Streambed Alteration Agreement No. 1600-2015-003-R2).

6 Documents in Project

Summary

SCH Number
2014022031
Lead Agency
California Department of Transportation, District 3
Document Title
I-80 Colfax Truck Climbing Lanes Project (Lake or Streambed Alteration Agreement No. 1600-2015-003-R2).
Document Type
NOD - Notice of Determination
Received
Posted
5/13/2015
Present Land Use
Transportation facility
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2015-0003-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, California Department of Transportation. Caltrans proposes to widen shoulders and construct a 12' wide truck climbing lane on eastbound Interstate 80. The proposed project will include the following features: -Widen shoulders and construct a 12' wide truck climbing lane on eastbound lane; -Extension and replacement of existing drainage facilities and construction of new drainage facilities such as inlets, cross culverts, under-drains, side ditches, and overside drains; -Replacement and relocation of metal beam guard rail and roadside signs; -Widening of Cape Horn undercrossing (Bridge Number 19-0091); -Construction of mountable concrete barrier approaching and through Magra overcrossing to shield bents on right shoulder; -Construction of a retaining wall along Interstate 80 between Magra overcrossing and Alpine overcrossing.

Contact Information

Name
Juan Lopez Torres
Agency Name
CDFW North Central Region
Contact Types
Lead/Public Agency

Location

Cities
Colfax
Counties
Placer
Parcel #
Various
Railways
UPRR
Section
26

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No