Lake or Streambed Alteration Agreement No. 1600-2015-0055-R1

4 Documents in Project

Summary

SCH Number
2014022015
Lead Agency
Toxic Substances Control, Department of (Department of Toxic Substances Control)
Document Title
Lake or Streambed Alteration Agreement No. 1600-2015-0055-R1
Document Type
NOD - Notice of Determination
Received

Document Description
The project is limited to the remedial activities to address elevated levels, VOCs, SVOCs, PAHs, and TPH in soil, soil vapor and groundwater, and lead in the soil at the site that resulted from the operation of the former Red Bluff MGP. Specific work includes: excavation and offsite disposal of approximately 4,000 cy of shallow-zone contaminated soils (0-10 ft deep); in-site solidification/stabilization treatment of approximately 2,000 cy of deep zone contaminated soils (10-35 ft deep); backfilling, compacting and grading of excavated sites with clean fill; and revegetation activities as per the Pacific Gas and Electric Manufactured Gas Plant, IS/MND for impacts on property owned by BOR (including SR 36 right of way).

Contact Information
Donna L. Cobb
CDFW
601 Locust Street
Redding, CA 96001

530-225-2314

Location

Coordinates
40°10'39.15"N 122°13'58.4"W
Counties
Tehama
Cross Streets
600 Rio Street
Zip
95080
Total Acres
1
Parcel #
29-423-07
State Highways
I-5
Railways
UPRR
Airports
Red Bluff
Schools
Head Start School
Waterways
Sacramento River
Township
27N
Range
3W
Section
20
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
CDFW, 601 Locust Street, Redding, CA 96001

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search