Pacific Gas and Electric Manufactured Gas Plant

4 Documents in Project

Summary

SCH Number
2014022015
Lead Agency
Toxic Substances Control, Department of (Department of Toxic Substances Control)
Document Title
Pacific Gas and Electric Manufactured Gas Plant
Document Type
NOD - Notice of Determination
Received
Posted
4/9/2014
Present Land Use
The site is zoned as commercial / industrial and was used as a hotel from the 1950s until 2010

Document Description
DTSC is considering approval of a Remedial Action Plan for the Pacific Gas & Electric (PG&E) company an additional adjacent parcel, and a right-of-way (hereinafter "the Site or Site Area") pursuant to Health & Safety Code, Division 20, Chapter 6.8 Section 25356.1 as submitted by PG&E. The RAP consists of remedial activities to address elevated levels of volatile organic compounds (VOCs), semi-volatile organic compounds (SVOCs), polycyclic aromatic hydrocarbons (PAHs), and total petroleum hydrocarbons (TPH) in soil, soil vapor and groundwater at the Site and lead in the soil.

Contact Information
Duane White
Department of Toxic Substances Control
8800 Cal Center Drive
Sacramento, CA 95826

Phone : (916) 255-3585

Location

Coordinates
40°10'39.15"N 122°13'58.4"W
Cities
Red Bluff
Counties
Tehama
Cross Streets
600 Rio Street
Zip
95080
Total Acres
1
Parcel #
29-423-07
State Highways
I-5
Railways
UPRR
Airports
Red Bluff
Schools
Head Start School
Waterways
Sacramento River
Township
27N
Range
3W
Section
20
Base
MDB&M

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Department of Toxic Substances Control, Brownfields and Evnironmental Restoration Program, 8800 Cal Center, Sacramento, CA 95826.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search