Feather River Parkway Phase II Project

6 Documents in Project

Summary

SCH Number
2014022014
Lead Agency
Yuba City
Document Title
Feather River Parkway Phase II Project
Document Type
NOD - Notice of Determination
Received
Posted
4/26/2016
Present Land Use
Parks, Recreation, Open Space, Flood District
Document Description
To construct 2.5 miles of public trails including excavating and re-grading approx. 4,200 (CY) of soil and 2,100 CY of crushed aggregate; install ten picnic tables; eight benches; two anchored bicycle racks; a 16-foot by 16-foot covered pavilion on a concrete slab; an 8-foot by 16-foot pre-cast concrete vault toilet; stabilize 100 linear-feet of eroding riverbank with the placement fo approx. 200 CY of rockslope protection; install fifteen interpretive signs and restore approx. 2 acres with native plants.

Contact Information

Name
James Herota
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency

Location

Cities
Yuba City
Counties
Sutter
Cross Streets
Von Geldern
Zip
95993
Total Acres
84
Parcel #
51-530-022
State Highways
Hwy 20
Airports
Yuba City
Waterways
Feather River
Township
15N
Range
13E
Base
MDB&M

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print