Manteca Family Entertainment Zone (Lake or Streambed Alteration Agreement No. 1600-2015-0015-R2)

11 Documents in Project

Summary

SCH Number
2014022008
Lead Agency
City of Manteca
Document Title
Manteca Family Entertainment Zone (Lake or Streambed Alteration Agreement No. 1600-2015-0015-R2)
Document Type
NOD - Notice of Determination
Received
Posted
5/9/2016
Present Land Use
Public/Quasi Public (PQP) land use and zoning
Document Description
The project is limited to the undergrounding of the French Camp Outlet Canal (FCOC) and the filling of two wetlands area in order to construct the larger multipurpose public use zone called the Manteca Family Entertainment Zone Project (FEZ). Development of the FEZ will require the relocation and conversion of the FCOC from an open water canal to an underground conveyance system. The FCOC will be routed north through the east utility corridor to the northern property boundary, then west to the current FCOC canal next to the railroad. To accommodate the flow, the channel will be replaced with dual 60-inch pipes.

Contact Information

Name
Tanya Sheya
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Manteca
Counties
San Joaquin
Cross Streets
Daniels Street/Milo Candini Drive
Total Acres
210.7
State Highways
SR 120
Railways
UPRR

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print