Widening and Railing Replacements at Three Bridges

15 Documents in Project

Summary

SCH Number
2014021064
Lead Agency
California Department of Transportation, District 6
Document Title
Widening and Railing Replacements at Three Bridges
Document Type
NOD - Notice of Determination
Received
Posted
4/23/2015
Present Land Use
transportation, agriculture, canal
Document Description
Caltrans will widen three existing bridges in rural Tulare County and replace the bridge railings: Sand Creek Bridge (No. 46-0137) at post mile 12.48 and the Friant-Kern Canal Bridge (No. 46-0065) at post mile 21.21 on State Route 201, and Kaweah River Bridge (No. 46-0091) at post mile 18.68 on State Route 216. These bridges will be widened to current design standards of 12-foot-wide lanes and 8-foot-wide shoulders. The bridge abutments will be widened to support the wider bridge. A total of 5.14 acres of additional right-of-way will be acquired from seven parcels. One 0.37 acre temporary construction easement of will be obtained at the Friant-Kern Canal. Utility relocation will be needed.

Contact Information

Name
Michelle Ray
Agency Name
California Department of Transportation, District 6
Contact Types
Lead/Public Agency

Location

Cities
Woodlake
Counties
Tulare
Cross Streets
SR 201/Road 116; SR 201/Friant-Kern Canal; SR 216/Dry Creek Drive
Zip
93615
State Highways
Hwy 65, 245, 198
Waterways
Sand Creek, Friant-Kern Canal, Kaweah River
Other Location Info
Cutler, Lemon Cove

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print