Friant-Kern Canal Bridge Widening Project (Streambed Alteration Agreement No. 1600-2016-0096-R4) Major Amendment No. 2

15 Documents in Project

Summary

SCH Number
2014021064
Lead Agency
California Department of Transportation, District 6 (DOT)
Document Title
Friant-Kern Canal Bridge Widening Project (Streambed Alteration Agreement No. 1600-2016-0096-R4) Major Amendment No. 2
Document Type
NOD - Notice of Determination
Received
Posted
1/12/2021
Document Description
The Project includes activities related to widening of the bridge at the State Route 201 crossing over the Friant-Kern Canal. Project activities will include water diversion, temporary access road construction, bridge column construction, bridge deck widening, bridge railing replacement, road resurfacing, and the placement of rock slope protection. On December 16, 2020, Caltrans requested a reduction in days of forecasted rainfall preceding concrete pouring, constituting this Major Amendment No. 2.

Contact Information

Name
Javier Mendez
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Woodlake
Counties
Tulare
Other Location Info
The Project will occur in and adjacent to the Friant-Kern Canal at the State Route 201 crossing, approximately 5.5 miles northwest of Woodlake in Tulare County, California; Southeast ¼ of Section 33, Township 16 South, Range 26 East, USGS 7.5 Minute Quad Map Ivanhoe, MDB & M; Latitude 36.485083, Longitude -119.156789.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.