Solar WWTP

Summary

SCH Number
2014021047
Lead Agency
City of Sanger
Document Title
Solar WWTP
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Recreation, School and Conservation (RSC) / Parks, Public Facilities
Document Description
The proposed project consists of construction and operation of a 1 megawatt photovoltaic tracking system to provide a sustainable energy resource for the existing WWTP. The project consists of single-axis trackers, grid-interactive inverters on concrete slabs and panel washing equipment. A total of 3,780 tiltable photovoltaic panels will be installed. The solar arrays will be enclosed by a 6-foot high chain link fence. The project system footprint is 574 feet by 499 feet or 286,041 sf (6.57 acres). The proposed will utilize the existing dirt road that is located just east of the project site for vehicular access to the facility. There will be a 6-foot high chain link fence around the entire perimeter of the arrays with a vehicle gate and a personnel gate.

Contact Information

Name
Brian Haddix
Agency Name
City of Sanger
Contact Types
Lead/Public Agency

Location

Cities
Sanger
Counties
Fresno
Cross Streets
Newmark / North
Zip
93657
Total Acres
6.57
Parcel #
332-042-36T
Railways
UPRR
Schools
Jefferson School
Waterways
Kings River
Township
14S
Range
22E
Section
26

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 6 (DOT), California Energy Commission, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), Department of Toxic Substances Control, Department of Water Resources, Office of Historic Preservation, Resources Agency, Resources, Recycling and Recovery
Development Types
Power:Solar (Megawatts 1)
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print