Nickelodeon Office Project

3 Documents in Project

Summary

SCH Number
2014021037
Lead Agency
City of Burbank
Document Title
Nickelodeon Office Project
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2014
Present Land Use
Zoning: BCCM GP: North Victory Commercial/Industrial
Document Description
The proposed project includes construction of: one 113,760 sf office building (5 stories maximum); one 137,229 sf parking structure (5 stories maximum) with 450 parking spaces; a fence/hedge up to ten feet in height along the front and street-side property lines; and related on-site improvements such as driveways, landscaping, and lighting. The project requires approval of a Development Review permit for the proposed construction, a CUP for the height of the office building greater than 70 feet, and a Variance for reductions to specified development standards (a 5-foot reduction in the front and street side setbacks to 10 feet minimum, up to a 10-foot high fence/hedge greater than three feet in height along the front and street-side property line, and eliminating the requirement for one tree per 40 linear feet of street frontage). The perimeter wall along the southwesterly 133 feet of the subject property would be removed, and the outdoor courtyard on the current Nickelodeon property located at 231-239 West Olive Avenue would be open to the project site.

Contact Information

Name
Brian Foote
Agency Name
City of Burbank
Contact Types
Lead/Public Agency

Location

Cities
Burbank
Counties
Los Angeles
Cross Streets
Olive and Lake Avenues
Zip
91502
Total Acres
1.49
State Highways
I-5
Railways
Metrolink
Schools
several
Township
1N
Range
14W
Section
10
Base
SBB&M

Notice of Determination

Approving Agency
City of Burbank
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print