Wastewater Treatment Facility Improvement Project
2 Documents in Project
Summary
SCH Number
2014021035
Lead Agency
Delhi County Water District
Document Title
Wastewater Treatment Facility Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
7/9/2014
Present Land Use
Existing Wastewater Treatment Facility / Agriculture (A) / General Agricultural (A-1)
Document Description
Proposed expansion of the District's wastewater treatment facility's (WWTF) treatment and discharge (disposal) capacity from 0.8 to 1.2 million gallons per day (mgd). Proposed project includes a new percolation pond with a bottom area of approximately two acres and maximum storage volume of approximately 6-acre feet, increasing the number of WWTF percolation basins from 4 to 5 basins, and a new approximately 52,500 square feet algae drying and storage pad. Proposed improvements would be constructed within the boundaries of the District's existing 48 acre WWTF site.
Contact Information
Name
Stephany Walton
Agency Name
Delhi County Water District
Contact Types
Lead/Public Agency
Address
Phone
Location
Coordinates
Counties
Merced
Cross Streets
Pinewood Street and Collier Road
Zip
95315
Total Acres
48.3
Parcel #
046-220-004 & 046-220-016
State Highways
Hwy 99
Railways
UPRR
Schools
Harmony Ranch ES
Waterways
Merced River, TID High Line Canal: MID Livingston
Township
6S
Range
11E
Section
15
Base
MDB&M
Other Location Info
Delhi
Notice of Determination
Approving Agency
Delhi County Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.