5901 Sunset
4 Documents in Project
Summary
SCH Number
2014021009
Lead Agency
City of Los Angeles
Document Title
5901 Sunset
Document Type
NOD - Notice of Determination
Received
Posted
9/6/2016
Present Land Use
Surface parking Lot / P-1, C4-1-SN / Highway Oriented Commercial
Document Description
Approved a General Plan Amendment from Hwy Oriented Commercial to Regional Center Commercial, a Zone and Height District Change from P-1 and C4-1-SN to (T)(Q)C4-2D and (T)(Q)C4-2D-SN, respectively, a Conditional Use for a Major Development Project for the addition of more than 100,000 sq. ft. of non residential floor area, and a Site Plan Review for a project that would result in an increase of 50,000 gross sq. ft. of non-residential floor area, all in conjunction with the development of a mixed-use project consisting of the removal of an existing surface parking lot and the new construction of a 15-story mixed-use office building with 26,000 sq. ft. of retail space and 274,000 sq. ft. of office uses for a total of approx. 300,000 sq. ft. of new floor area (4.5:1 FAR), with 830 parking spaces in two subterranean levels and five levels of above-grade parking. The project site is located at 5901 Sunset Blvd. and 1515 North Bronson Ave.
Contact Information
Name
Erin Strelich
Agency Name
City of Los Angeles
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Los Angeles
Cross Streets
Sunset Boulevard and Bronson Avenue
Zip
90028
Total Acres
1.55
Parcel #
554500: 9033, 9032, 9030, 9029
State Highways
US 101
Schools
Citizens of the World Helen Bernstein HS
Other Location Info
Hollywood
Notice of Determination
Approving Agency
City of Los Angeles
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.