5901 Sunset

4 Documents in Project

Summary

SCH Number
2014021009
Lead Agency
Los Angeles, City of (City of Los Angeles)
Document Title
5901 Sunset
Document Type
NOD - Notice of Determination
Received

Document Description
Approved a General Plan Amendment from Hwy Oriented Commercial to Regional Center Commercial, a Zone and Height District Change from P-1 and C4-1-SN to (T)(Q)C4-2D and (T)(Q)C4-2D-SN, respectively, a Conditional Use for a Major Development Project for the addition of more than 100,000 sq. ft. of non residential floor area, and a Site Plan Review for a project that would result in an increase of 50,000 gross sq. ft. of non-residential floor area, all in conjunction with the development of a mixed-use project consisting of the removal of an existing surface parking lot and the new construction of a 15-story mixed-use office building with 26,000 sq. ft. of retail space and 274,000 sq. ft. of office uses for a total of approx. 300,000 sq. ft. of new floor area (4.5:1 FAR), with 830 parking spaces in two subterranean levels and five levels of above-grade parking. The project site is located at 5901 Sunset Blvd. and 1515 North Bronson Ave.

Contact Information
Erin Strelich
City of Los Angeles
200 N. Spring Street, Room 750
Los Angeles, CA 90012

213 978 1351

Location

Coordinates
34°5'54"N 118°19'6"W
Counties
Los Angeles
Cross Streets
Sunset Boulevard and Bronson Avenue
Zip
90028
Total Acres
1.55
Parcel #
554500: 9033, 9032, 9030, 9029
State Highways
US 101
Schools
Citizens of the World Helen Bernstein HS
Other Location Info
Hollywood

Notice of Determination

Approving Agency
City of Los Angeles
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
200 N. Spring Street, 7th Floor, Los Angeles, CA 90012

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search