Famoso SR 46/99 Bridge Replacement Project
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2014021006
- Lead Agency
- Caltrans 6 (Fresno) (California Department of Transportation, District 6)
- Document Title
- Famoso SR 46/99 Bridge Replacement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/28/2014
- Present Land Use
- agricultural, commercial or industrial and Caltrans Right of Way
- Document Description
- The CA Department of Transportation (Caltrans) proposes to build a new bridge on the south side of the existing State Route 46/99 separation bridge and replace the existing ramps on SR 99. The existing bridge would be demolished after the new bridge is in place. The southbound ramps would be replaced with half-diamond standard ramps, and the northbound ramps would be connected with a T-intersection at Famoso Road. The new bridge and ramps would be consistent with current design standards for the SR 99 corridor.
- Contact Information
-
Michelle Ray
California Department of Transportation, District 6
855 M Street, Suite 200
Fresno, CA 93721
Phone : (559) 445-5286
Location
- Cities
- Wasco
- Counties
- Kern
- Cross Streets
- Kern 46/99 Separation Bridge
- State Highways
- SR 46-PM 57.35/57.8
- Waterways
- Lerdo Canal
Notice of Determination
- Approving Agency
- CA State Department of Transportation
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- CA State Department of Transportation, 855 M Street, Suite 200, Fresno, CA 93721
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.