21 Bishop Lane, Minor Subdivision
Summary
SCH Number
2014019001
Lead Agency
San Mateo County
Document Title
21 Bishop Lane, Minor Subdivision
Document Type
NOD - Notice of Determination
Received
Posted
1/6/2014
Document Description
The project includes the removal of a gabion basket structure and installation of a 6-inch diameter drainage pipe at 21 Bishop Lane, Menlo Park, San Mateo County. The existing 8-foot long, 5-foot wide and 3-foot high gabion basket installed at the top of the bank of San Franciscquito Creek will be removed by hand and native vegetation will be planted in that location. The drainage pipe will be extended to the lower terrace of the existing retaining wall, and will include placement of a t-pipe and rock energy dissipater at the outfall. The rock dissipater will be ~5 feet long by 5 feet wide and 6 inches deep. The new drainage pipe will act as a secondary drainage system capturing and diverting overflow from the primary drainage system (4-foot deep wells) located in front of capturing and diverting overflow from the primary drainage system located in front of the property.
CDFW is executing a Lake and Streambed Alteration Agreement, Number 1600-2013-0449-R3, pursuant to Section 1602 of the Fish and Game Code to the project Permittee, Ramin Shahidi.
Contact Information
Name
Suzanne DeLeon
Agency Name
CA Dept. of Fish and Wildlife
Contact Types
Lead/Public Agency
Phone
Location
Cities
Menlo Park
Counties
San Mateo
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A