Airport Electric Vehicle (EV) Fast Charging Project

Summary

SCH Number
2014018272
Public Agency
Sacramento Municipal Utility District
Document Title
Airport Electric Vehicle (EV) Fast Charging Project
Document Type
NOE - Notice of Exemption
Received
Posted
1/27/2014
Document Description
SMUD proposes to construct and operate an Electric Vehicle (EV) Fast Charging station at the Arco Gas Station at the Sacramento International Airport. The proposed project consists of two Direct Current (DC) fast chargers and two level 2 Electric Vehicle Engine (EVE) chargers. The project will be built on the southeast corner of the lot for the existing facility. The primary structure will be a carport constructed over the charging stations which will also provide shade for parked cars.

Contact Information

Name
Rob Ferrera
Agency Name
Sacramento Municipal Utility District
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Other Location Info
Sacramento International Airport

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15303 (e), Class 3
Reasons for Exemption
New Construction or Conversion of Small Structures

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print