Airport Electric Vehicle (EV) Fast Charging Project
Summary
SCH Number
2014018272
Public Agency
Sacramento Municipal Utility District
Document Title
Airport Electric Vehicle (EV) Fast Charging Project
Document Type
NOE - Notice of Exemption
Received
Posted
1/27/2014
Document Description
SMUD proposes to construct and operate an Electric Vehicle (EV) Fast Charging station at the Arco Gas Station at the Sacramento International Airport. The proposed project consists of two Direct Current (DC) fast chargers and two level 2 Electric Vehicle Engine (EVE) chargers. The project will be built on the southeast corner of the lot for the existing facility. The primary structure will be a carport constructed over the charging stations which will also provide shade for parked cars.
Contact Information
Name
Rob Ferrera
Agency Name
Sacramento Municipal Utility District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Sacramento
Other Location Info
Sacramento International Airport
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15303 (e), Class 3
Reasons for Exemption
New Construction or Conversion of Small Structures
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.