Phase 1 Design/Prelim Engineering for Capitol Corridor Station Bicycle Access Plan
Summary
SCH Number
2014018186
Public Agency
Bay Area Rapid Transit District
(BART)
Document Title
Phase 1 Design/Prelim Engineering for Capitol Corridor Station Bicycle Access Plan
Document Type
NOE - Notice of Exemption
Received
Posted
1/16/2014
Document Description
The Project will create the basis for the Captiol Corridor Joint Powers Authority (CCJPA) to establish a bicycle storage standard for design(s) and procurement for secure bicycle storage facilities at the existing 17 stations (and set the standard for future stations) along the Capital Corridor route. The next phase will implement/construct the appropriate bicycle storage facility at each of the exisitng stations.
Contact Information
Name
Janie Layton
Agency Name
Bay Area Rapid Transit District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Roseville
Counties
Placer
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301
Reasons for Exemption
Project provides public access improvements with minor modifications to an existing facility.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.