Continental Maritime of San Diego Piers 4 and 6 Fender System Replacement

Summary

SCH Number
2014018028
Public Agency
San Diego Unified Port District
Document Title
Continental Maritime of San Diego Piers 4 and 6 Fender System Replacement
Document Type
NOE - Notice of Exemption
Received
Posted
1/7/2014
Document Description
The proposed project involves replacing the fender system serving Piers 4 and 6 at Continental Maritime of San Diego (CMSD), located at 1995 Bay Front Street in San Diego. Piers 4 and 6 currently utilize floating timber camels to hold ships at berth at a distance of the pier. These floating camels are approximately 30 years old and are nearing the end of their useful life. Upgrading the existing floating camels is neither practical nor economically feasible, thus, CMSD is proposing to remove and replace the existing floating camels with cylindrical floating foam filled fenders backed by a steel panel attached to a group of four steel H piles (two existing and two new).

Contact Information

Name
Mayra Medal
Agency Name
San Diego Unified Port District
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15302, 15303, Class 2 & 3
Reasons for Exemption
Replacement or Reconstruction and/or New Construction or Conversion of Small Structures.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.