Napa River Restoration: Oakville to Oak Knoll - Group C: Sites 11-13
9 Documents in Project
Summary
SCH Number
2014012057
Lead Agency
Napa County
Document Title
Napa River Restoration: Oakville to Oak Knoll - Group C: Sites 11-13
Document Type
NOD - Notice of Determination
Received
Posted
3/23/2017
Present Land Use
LU: Agriculture
Z: Agriculture Preserve
GPD: Agricultural Resource
Document Description
The Oakville to Oak Knoll Reach Restoration Project includes approx. 4.8 miles of channel restoration activities along a 9 mile reach of the Napa River between the Oakville Cross Road Bridge and Oak Knoll Avenue Bridge, near the Town of Yountville. Sites 11-13 specifically include the following restoration actions: channel widening,. instream structure placements, and floodplain restoration. Group C: Sites 11-13 are located on the east side of Napa River, immediately downstream from Yountville Cross Road and east of Site 14 previously constructed. The sites extend approx. 0.40 miles along the Napa River channel between river station 270+00 and 249+00. The CDFW is executing Lake and Streambed Alteration Agreement No. 1600-2016-0363-R3, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Richard Thomasser, Napa County Dept. of Public Works.
Contact Information
Name
Garret Allen
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Cities
Yountville
Counties
Napa
Cross Streets
Between Oakville Cross Road Bridge and the Oak Knoll Avenue Bridge
Zip
94599
Total Acres
108
Parcel #
Various
State Highways
Hwy 29 and 128
Railways
No
Airports
No
Schools
No
Waterways
Napa River
Base
MDB&M
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.