Nelson Road Reestablishment
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2014012044
- Lead Agency
- Santa Cruz County
- Document Title
- Nelson Road Reestablishment
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/2/2014
- Present Land Use
- Agricultural/Mountain Residential and County Right of Way
- Document Description
- The proposed project is the removal of the temporary access road crossing, restoration of the crossing area, and reestablishment of the permanent road adjacent to the previous alignment, Ruins Creek and the toe of the 2011 landslide. The scope of the work for the entire project shall consist of the following: excavation and backfill (2,675 cubic yards), two mechanically stabilized earth backfill (MSE) retaining walls, drainage culvert improvements, asphalt concrete pavement, erosion control, restoration of the creek channel, and removal of approximately 220 feet of the existing temporary bypass road where it crosses Ruins Creek, with associated upland and riparian revegetation.
- Contact Information
-
Matt Johnston
Santa Cruz County
Lead/Public Agency
701 Ocean Street, 4th Floor
Santa Cruz, CA 95060
Phone : (831) 454-3201
Location
- Cities
- Scotts Valley
- Counties
- Santa Cruz
- Cross Streets
- Lockhart Gulch
- Zip
- 95066
- Total Acres
- .5
- Parcel #
- 070-011-28
- Waterways
- Ruins Creek
Notice of Determination
- Approving Agency
- County of Santa Cruz
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- County of Santa Cruz Planning Department 701 Ocean Street, 4th Floor, Santa Cruz CA 95060
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.